2027 at-ND-182 Aturawa G5 Pedicure Nails Drill Supplies Salon Equipment Lamp Professional

Still deciding? Get samples of $ !
Order Sample

Product Description

Basic Info
Model NO.
AT-ND-182 Pedicure Nails Drill
Material
Plastic
Rotated Speed
28000rpm
Max Torque
2.8n.Cm
Power
65W
Certification
CE/RoHS
Product Description

"G5" Electric Nail File

The integrated high power engine at the handpiece allows for permanent operation at maximum rotation speed. The handpiece is highly balanced, ensuring precise work with minimal vibration. Foot pedal compatible (pedal not included).

About Us

Established in 2008, we specialize in the production and sales of hand-held high-speed brushless electronic grinders and accessories. Our factory utilizes excellent imported mechanical processing equipment and mature production technology.

Our company has produced core parts of high-end grinders, achieving technical indexes that meet or exceed imported products. We independently developed dual-drive control chips to support stable output, filling a significant gap in the industry.

Our products are widely used in jewelry, stone, dentistry, nail salons, and precision repair industries. We offer high-quality nail drills, carving machines, nail lamps, and accessory parts.

Production Process
Transportation & Packaging
FAQ
1. Are you a factory?
Yes, we are a direct manufacturer with advanced processing equipment from Japan and Germany, offering professional customized services and competitive factory pricing.
2. What are your main advantages?
We have over 10 years of industry experience, a strict quality control system, and in-house core processing equipment, ensuring top-tier quality and price competitiveness.
3. Do you offer OEM services?
Yes. We can laser your logo on handpieces (for orders over 100PCS) and provide customized inner box packaging (minimum charge applies).
4. What is the MOQ?
For standard wholesale nail drill items, the MOQ is 1 piece. For OEM logo designs, please contact us for specific requirements.
5. What is the lead time?
For stock items, delivery is 3-7 days. For large quantities and OEM orders, estimated delivery is 10-20 days depending on the design.
6. How to confirm an order?
1. Select your desired design. 2. Send us your inquiry with quantity. 3. Receive our quote. 4. Process payment (100% for samples/small orders; 30-50% deposit for large/OEM orders). 5. Mass production and quality check. 6. Final payment and shipping.
More Products

Related Products